Salt Shed Design & Parking Lot Upgrades

PROJECT IMAGES

*click the images to view the larger version

PROJECT INFORMATION

LOCATION: Rockville Centre, NY
AGENCY: Incorporated Village of Rockville Centre
COMPLETION DATE: Ongoing

PROJECT DESCRIPTION

B. Thayer Associates was contracted to provide design services and utility coordination as part of a drawing and specification package for a salt storage facility and parking lot upgrades. The project required obtaining an Article 25 Tidal Wetland permit from the NYS Department of Environmental Conservation due to the proximity of the proposed salt shed to a delineated Tidal Wetland boundary. Upon obtaining final design approval and gathering all of the necessary permits, our firm assisted the Village with construction related services including: shop drawings, submittal approvals, vendor correspondences and required inspections.
Our scope of work includes:
  • Preliminary analysis of salt shed options
  • Completion of final design and contract documents for new 2,000 ton salt shed and parking lot improvements
  • New rehabilitated parking lot
  • Upgrades to park adjacent to new salt shed
  • Site & landscape upgrades
  • New drainage
  • Architectural & structural design
  • SWPPP (Erosion & Sediment Control)
  • New electrical upgrades, lighting and transfer switch
  • Utility coordinating
  • Cost estimating
  • Condition ratinPreparation and coordination of bid documentsg percentage
  • Construction support services