FDR Waterborne Inspection and Rehabilitation Analysis

PROJECT IMAGES

*click the images to view the larger version

PROJECT INFORMATION

LOCATION: Manhattan, NY
AGENCY: NYCDOT
COMPLETION DATE: Expected April 2018

PROJECT DESCRIPTION

B. Thayer Associates was retained to provide a structural inspection, load rating calculations, and rehabilitation design recommendations for the FDR DRIVE Northbound Bridge from East 42nd Street to East 49th Street. Originally constructed in 1952, the bridge structure is located underneath the United Nations viaduct. Here, the FDR Drive widens to accommodate the viaduct columns and the northbound roadway cantilevers over the East River. Due to the structure’s age and proximity to the brackish East River, the structure has deteriorated. NYCDOT is considering rehabilitation or replacement of the structure to meet current traffic and loading demands.
Scope of work included:
  • Waterborne structural inspection
  • Identified and documented existing in-situ element conditions to calculate element section loss
  • All inspection results were documented in a report in conjunction with a load rating analysis and rehabilitation recommendations
Scroll to Top